HYDROPOWER DEVELOPMENT-A CASE STUDY IN PAKISTAN

HYDROPOWER DEVELOPMENT-A CASE STUDY IN PAKISTAN
Автор
 
Год
 
Страниц
 
72
ISBN
 
9783639230994
Категория
 
Новые поступления

Описание:

Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Ghazi-Barotha is a runoff river hydropower project located at downstream of Tarbela and on left bank of Indus River. The project was studied to feasibility level in 1990, implementation was started in 1995 and now in operation since 2003. The project is being operated with full capacity during peak hours but be influenced by Kalabagh reservoir during August to March. The reduction in head to some extent reduces the power and energy. This research work had analyzed and evaluated the extent of reduced power and energy considering 20 year flow data. Finally conclusion and recommendations are drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge...

Похожие книги

POWER POTENTIAL FOR A DAM SITEPOWER POTENTIAL FOR A DAM SITE
Автор: Muhammad Kaleem Sarwar
Год: 2010
ARSENIC: DANGEROUS AND HARMFUL FOR HEALTHARSENIC: DANGEROUS AND HARMFUL FOR HEALTH
Автор: Muhammad Latif
Год: 2010
TRICKLE IRRIGATION PERFORMANCE IN ORCHARDSTRICKLE IRRIGATION PERFORMANCE IN ORCHARDS
Автор: Muhammad Latif
Год: 2010
Apache AbderaApache Abdera
Год: 2011
Dell ComicsDell Comics
Год: 2011